STEP 01
Survey and scope
We look at the plant and agree what is included, what is not, and how the records should be written.
How we work
We agree the scope first. Our engineers then follow your programme. The documents are finished before we hand the package over.
Not every package needs every step. What is included is agreed at the start, and then it is done in this order.
STEP 01
We look at the plant and agree what is included, what is not, and how the records should be written.
STEP 02
We set the control strategy out in writing, to the schedules and the plant you have described.
STEP 03
Our engineers support the BMS installation on site, with the installing team.
STEP 04
Each point is tested from the field device back to the controller. The result is written down.
STEP 05
We run the plant and the controls through the sequences, enables and safeties in the strategy.
STEP 06
We attend witnessing with the people you invite, and we record what was seen.
STEP 07
Test sheets, snag lists, O&M manuals and other handover documents are issued in your format.
01
We work in the plantroom and on the floors when the job needs people there. Otherwise we support the system remotely.
02
We complete the agreed scope, including the records.
03
Notes are written so someone who was not there can see what was tested, what was witnessed, and what is still open.
04
We work to your drawings, strategy and document format.
On site, we follow the safety arrangements and the programme set for the project.
Point-to-point results, commissioning notes, software loads and graphics checks are written down.
Test sheets, snag lists, close-out notes and handover documents are prepared in the integrator’s format, for the items in the scope.
Contact
Email what you need on site, and the programme if you have one. The company will say if it can take the package.